thunderbolt: Calculate DisplayPort tunnel bandwidth after DPRX capabilities read

According to USB4 Connection Manager guide, after DisplayPort tunnel was
setup, the DPRX capabilities read is performed by the DPTX. According to
VESA spec, this shall be completed within 5 seconds after the DisplayPort
tunnel was setup. Hence, if the bit: DPRX Capabilities Read Done, was
not set to '1' by this time, we timeout and fail calculating DisplayPort
tunnel consumed bandwidth.

Signed-off-by: Gil Fine <gil.fine@linux.intel.com>
Signed-off-by: Mika Westerberg <mika.westerberg@linux.intel.com>
This commit is contained in:
Gil Fine 2024-01-23 15:56:42 +02:00 committed by Mika Westerberg
parent 52a4490e89
commit ccd8450211

View File

@ -1184,17 +1184,13 @@ static int tb_dp_consumed_bandwidth(struct tb_tunnel *tunnel, int *consumed_up,
/*
* Then see if the DPRX negotiation is ready and if yes
* return that bandwidth (it may be smaller than the
* reduced one). Otherwise return the remote (possibly
* reduced) caps.
* reduced one). According to VESA spec, the DPRX
* negotiation shall compete in 5 seconds after tunnel
* established. We give it 100ms extra just in case.
*/
ret = tb_dp_wait_dprx(tunnel, 150);
if (ret) {
if (ret == -ETIMEDOUT)
ret = tb_dp_read_cap(tunnel, DP_REMOTE_CAP,
&rate, &lanes);
if (ret)
return ret;
}
ret = tb_dp_wait_dprx(tunnel, 5100);
if (ret)
return ret;
ret = tb_dp_read_cap(tunnel, DP_COMMON_CAP, &rate, &lanes);
if (ret)
return ret;