IF YOU WOULD LIKE TO GET AN ACCOUNT, please write an
email to Administrator. User accounts are meant only to access repo
and report issues and/or generate pull requests.
This is a purpose-specific Git hosting for
BaseALT
projects. Thank you for your understanding!
Только зарегистрированные пользователи имеют доступ к сервису!
Для получения аккаунта, обратитесь к администратору.
The current sched rt code is broken when it comes to hierarchical
scheduling, this patch fixes two problems
1. It adds redundant enqueuing (harmless) when it finds a queue
has tasks enqueued, but it has no run time and it is not
throttled.
2. The most important change is in sched_rt_rq_enqueue/dequeue.
The code just picks the rt_rq belonging to the current cpu
on which the period timer runs, the patch fixes it, so that
the correct rt_se is enqueued/dequeued.
Tested with a simple hierarchy
/c/d, c and d assigned similar runtimes of 50,000 and a while
1 loop runs within "d". Both c and d get throttled, without
the patch, the task just stops running and never runs (depends
on where the sched_rt b/w timer runs). With the patch, the
task is throttled and runs as expected.
[ bharata, suggestions on how to pick the rt_se belong to the
rt_rq and correct cpu ]
Signed-off-by: Balbir Singh <balbir@linux.vnet.ibm.com>
Acked-by: Bharata B Rao <bharata@linux.vnet.ibm.com>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Cc: stable@kernel.org
LKML-Reference: <20110303113435.GA2868@balbir.in.ibm.com>
Signed-off-by: Ingo Molnar <mingo@elte.hu>