IF YOU WOULD LIKE TO GET AN ACCOUNT, please write an
email to Administrator. User accounts are meant only to access repo
and report issues and/or generate pull requests.
This is a purpose-specific Git hosting for
BaseALT
projects. Thank you for your understanding!
Только зарегистрированные пользователи имеют доступ к сервису!
Для получения аккаунта, обратитесь к администратору.
If we delay sending End Transfer for Setup TRB to be prepared, we need
to check if the End Transfer was in preparation for a driver
teardown/soft-disconnect. In those cases, just send the End Transfer
command without delay.
In the case of soft-disconnect, there's a very small chance the command
may not go through immediately. But should it happen, the Setup TRB will
be prepared during the polling of the controller halted state, allowing
the command to go through then.
In the case of disabling endpoint due to reconfiguration (e.g.
set_interface(alt-setting) or usb reset), then it's driven by the host.
Typically the host wouldn't immediately cancel the control request and
send another control transfer to trigger the End Transfer command
timeout.
Fixes: 4db0fbb60136 ("usb: dwc3: gadget: Don't delay End Transfer on delayed_status")
Cc: stable@vger.kernel.org
Signed-off-by: Thinh Nguyen <Thinh.Nguyen@synopsys.com>
Link: https://lore.kernel.org/r/f1617a323e190b9cc408fb8b65456e32b5814113.1670546756.git.Thinh.Nguyen@synopsys.com
Signed-off-by: Greg Kroah-Hartman <gregkh@linuxfoundation.org>