IF YOU WOULD LIKE TO GET AN ACCOUNT, please write an
email to Administrator. User accounts are meant only to access repo
and report issues and/or generate pull requests.
This is a purpose-specific Git hosting for
BaseALT
projects. Thank you for your understanding!
Только зарегистрированные пользователи имеют доступ к сервису!
Для получения аккаунта, обратитесь к администратору.
As noted in doc/assumptions.txt, the SHELL based target tracing
only works for rules with recipes, even empty but present ones.
The simplest thing to do is hooking "; @:" onto the rule's tail
(one-liner with a non-printing shell builting "true" command).
It looks like the intermediate targets aren't all equal:
some define a finished feature while some create a common
lower level piece of configuration.
Let's do shortcuts for the former so that a distro line can be
more terse and descriptive; help targets in features.in/ tweaked
accordingly.
The package list taken from mkimage-profiles-desktop
and trimmed down due to current TDE packaging difference
as well as extras being defined elsewhere.
It's preferred for Razor-qt's logout app to be able to turn
the system off or reboot it; xdm lacks consolekit support.
Thanks Alexander Sokoloff for the hint.
Some parts of *image* configuration started slipping down
into the *feature* configuration, and that was wrong; fixed.
Also introduced proper use/live/x11 (via use/x11/xorg with added
wacom support for the sake of #26723/#26724) and rebased the
pre-existing descendants onto it.
As too many things started duplicating between distros proper
and (e.g. corresponding) LiveCDs, it became apparent that a class
of entities which end up working for THE_USER (not a sysadmin,
and not a developer, just a Linux user) is in need.
So THE_KMODULES will power installed basesystem and live image,
while THE_PACKAGES, THE_LISTS and THE_GROUPS will participate
in building those.
This one is pre-alpha quality and very basic but complete enough
to crank out an icewm.iso successfully installing and booting
into xdm ;-)
(actually a week's on-and-off work including a pile of
underlying infrastructure stuff which was planned already
just not there yet)