IF YOU WOULD LIKE TO GET AN ACCOUNT, please write an
email to Administrator. User accounts are meant only to access repo
and report issues and/or generate pull requests.
This is a purpose-specific Git hosting for
BaseALT
projects. Thank you for your understanding!
Только зарегистрированные пользователи имеют доступ к сервису!
Для получения аккаунта, обратитесь к администратору.
One thing that's very confusing about OSTree is there are two layers -
deployments and the refs/commits. If one does an `rpm-ostree upgrade`, but then
e.g. `ostree admin undeploy 0`, you still have the new revision in the repo.
We don't do a good job of displaying this state, or helping people clean
it up.
Down the line, I also want to better support something like `rpm-ostree pull` to
cache updates explicitly *without* deploying.
This commit just adds a bit of information to the status display. We might want
to have better formatting, but I think this an OK start.
Closes: #595
Approved by: jlebon
I don't see a reason not to require more stuff to execute tests,
and having it be optional reduces our coverage unnecessarily.
Closes: #580
Approved by: jlebon
We seem to have substantial infrastructure drift here between the two, and I was
*really* confused why `TEST_SKIP_CLEANUP` wasn't being honored. Turned out in
rpm-ostree we have tmpdir code in two places, not entirely sure why. Punting
full cleanup.
Closes: #566
Approved by: jlebon
During a deploy operation, we would fetch commit objects from the remote
to resolve the version string. If gpg-verify was turned on, we would
fail to pull them if some of the commits were not signed. This is
because we pulled them in batches. We partially address this by only
fetching the HEAD commit on the first pass. This allows `upgrade`
operations to work just as well as `deploy` operations.
Though there is still an issue if we have to traverse farther back than
when signed commits become unsigned (unless they happen to fall on a
batch boundary). We leave that unsolved for now, since that would likely
require a more complex solution and it's not clear whether it's a real
world issue (signers can just retroactively sign commits).
Copy the gpghome from ostree so that we can test GPG-related cases in
our suite.
Closes: #527Closes: #557
Approved by: cgwalters
Expand the available options in the Rebase() D-Bus method to also have a
"revision" key. Its value has the same semantics as the "revision" key
in the Deploy() method (e.g. the "revision=" and "version=" prefixes are
also supported). Also expand the rebase CLI to allow for specifying the
revision as an additional argument.
This allows users to rebase to a specific version or checksum, rather
than only to the latest. Conceptually, this is the equivalent of doing a
rebase followed by a deploy. I.e. we specify an override-commit in the
origin and expect the same behaviours that apply after a deploy to also
apply here.
Closes: #212Closes: #555
Approved by: cgwalters
Our current compose tests only use a synthetic `empty.rpm`, but
this really limits usefulness.
Let's make a test suite that requires an internet connection and
downloads Fedora RPMs and does "real" tree composes.
See the updated `tests/README.md` for more information.
This is still a WIP.
Closes: #531
Approved by: jlebon
This is a very simple test harness inspired by the atomic one. It's a
simple bash script that sets up a permanent ssh connection to the host
and runs the test scripts. Also add a "demo" test-basic.sh test to make
sure that it works.
Closes: #344
Approved by: cgwalters
- Move all the uninstalled, non-destructive tests to check/
- Add a README
- Move utilities to utils/
- Move common files to common/
Closes: #304
Approved by: cgwalters